The cameras and switches are the easy part.

Recent jobs, written up the way we build them: the pathway, the splice, the schedule, and the paperwork. No outcomes we can't back up, no quotes we didn't get in writing.

TCW Tower at 865 South Figueroa, downtown Los Angeles, at dusk
Avison Young

Two floors of a downtown tower, cabled to the tenant's standard

Structured cabling · Tenant improvement · Downtown Los Angeles

A Metro tenant space on the third and fifth floors of 865 South Figueroa: a design the tenant approved before a cable was pulled, 496 Cat6A drops to 248 outlets, a new MDF on one floor and a rebuild inside the existing racks on the other, and singlemode fiber from the riser to each. Every copper and fiber link tested, labeled, and documented for the tenant's network team.

Read the project
County of Orange Board of Supervisors chambers
County of Orange

Countywide structured cabling and installation services

Structured cabling · Engineering and design · Countywide

WCC has held the County's structured cabling contract since 2021, extended twice and now running through February 2028. More than a hundred service requests a year, worked through the County's ServiceNow, every one under prevailing wage with certified payroll and background-checked technicians. Some weeks that's three or four tickets open at once; the standard and the paperwork are the same on all of them.

Read the project
WCC technicians on the Vincent Thomas Bridge walkway above the Port of Los Angeles Main Channel
Port of Los Angeles

Fiber backbone repair on the Vincent Thomas Bridge

Fiber optics · Air-blown fiber · San Pedro

The air-blown fiber backbone along the eastern span had failed between two bents. During a single scheduled outage, our crew removed the old fiber and tube, installed new Sumitomo FutureFLEX duct with splice centers at three bents and two port vaults, blew in six 24-strand singlemode cables, and fusion-spliced and tested every strand before the bridge went back in service. In service since 2022 with no fiber-related outages.

Read the project
On every job

What you get whether it's three doors or three campuses.

A design you can bid

Site walk, drawings, and a bill of materials from our own estimators. RCDD review on every cabling scope.

Our own crew

W-2 technicians, licensed C-7, C-10, and C-28. Pre-staged equipment and after-hours cutovers when your operation can't stop.

Paperwork that holds up

Test results for every cable and strand, machine labels, as-builts, and certified payroll when the job calls for it.

Get Started

Have a job like one of these?

Send us the drawings, the spec, or a description of what's failing. An engineer will walk the site and come back with a written scope and price.